Anytime Fitness – Dee Why

Anytime Fitness – Dee Why Premium inverter Daikin systems with exposed insulated sheet metal ductwork was installed into the 24 hour gym. The exposed ductwork was used to match the aesthetic of the gyms already exposed frames. This system is top of the range to cater for the gyms extensive needs in keeping their customers […]

Anytime Fitness – Mona Vale

Anytime Fitness – Mona Vale 12th June 2020 Back at site today for a walk through with our client – Anytime Fitness. Our projects team are carrying out some further testing of our completed product in readiness for the re-opening of gyms post COVID. They are a very happy client! The finished look of the […]

Service Work – Condenser Replacement

Service Work – Condenser Replacement 11th August 2019 One of our clients who owns a commercial office property has had their condensers damaged from a previous hail storm. The damage was bad enough to cause gas leaks of the existing condenser coils on the rooftop. So they opted to replace each system. The only way […]

Anytime Fitness – Neutral Bay Project

Anytime Fitness – Neutral Bay Project 31st July 2017 This project required a crane lift to replace the PAC units on the gyms rooftop. We upgraded this anytime location to a new Temperzone system which will provide the best air quality possible.  Previous Next

Kimbriki Waste Management Admin Building

Kimbriki Waste Management Admin Building 9th February 2017 Installation works of Mitsubishi VRF System on upper ground floor of the Kimbriki Waste Management Admin Building.  Previous Next

MJ Bale – Sydney

MJ Bale – Sydney 1st July 2015 We are very happy with the outcome of our MJ Bale project. The team were able to install  a reliable chilled water air conditioning system using linear slot diffusers which suits the premium feel of this retail store.  Previous Next

ALDI HQ – Minchinbury

ALDI HQ – Minchinbury The Aldi headquarters received an installation using the latest Temperzone Digital rooftop package units. The finest in sound attenuating ductwork was installed which provided the quietest possible airflow through frameless linear bar grilles. The system was fitted and maintained via a BMS system. This project blends the fine detailing normally seen in […]

Australia Post HQ – St Leonards

Australia Post – St Leonards 1st September 2013 This Australia Post facility was fitted with an economic fitout with after hours control, using an Actron ducted ventilation system. The installation is cost efficient and easy to maintain. Previous Next